Ramat Aviv Mall
The addition of a floor and renovation of a mall area within the Ramat Aviv Mall, Tel Aviv, with an area of about 5,500 sqm. Electra Danko performed work including construction of part of an additional floor, as well as construction, systems, and fitout work for some mall areas. This work included extending elevator shafts from the basement to the additional floor, constructing staircases, demolishing an active ramp and reconnecting it to the existing building, dismantling skylights, and constructing a new skylight on the additional floor. This was a complex project with many challenges, including the need to work within an active mall. All activities were performed with the greatest care and attention to safety, including complex demolition work that requiredthrough, detailed planning due to the location at the heart of a residential neighborhood.
Oversight - BA Eichenbaum Supervision & Management Ltd.